Thursday, 17 May 2012

First Show.

 The Salisbury MRC show at Wilton was Teignfords first public showing. With a respite from the rain a good attendance was achieved, indeed I believe that the numbers were up on last year.
The show was useful as a few glches were shown up and it has confirmed my belief that the end boards are too tight for satisfactory running. So a couple of new boards are in the making which will make the layout some fourteen feet long with an easier to use fiddle yard.
The two front boards ran well and need little addition once the bank opposite the engine shed has the dwellings fitted.
All in all a good weekend which turned out to be not as stressful as I had expected.

Tuesday, 15 May 2012

Little Devil.

A one piece casting in white metal captures the GWR Fire Devil perfectly. As part, or separately, of the Water Tower kit this piece of aparatus was seen all over the GWR network.
It does what it says on the tin- keeps water cranes from freezing up during the extremes of winter. A small fire was lit in the base to provide heat and hot air kept the water in the crane liquid.
Usually seen rusty, this example has been painted with Revell acrylic Dark Leather with a little lighter rust dry brushed over.

Sunday, 13 May 2012

Engine Shed.

 With Teignford debuting on the exhibition circuit this weekend, I took several photos to see how the buildings had bedded in.
The camera is crueller than the naked eye and I am able to pick up things that don't seem quite right.
However, I am fairly pleased with these views and am considering how much more junk has to be scattered around this area before it becomes too cluttered.
Comments or suggestions are always welcome.

Friday, 11 May 2012

Teignford will make its debut at the Salisbury Model Railway Exhibition, Michael Herbert Hall, South Street, Wilton, Salisbury, SP2 0JS, this weekend 12th & 13th May. Open at 10.30 - 16.30 Saturday and 10.00 - 16.00 Sunday. Look forward to seeing some of the blog followers and wether it has been worth the effort!

Sunday, 6 May 2012

Doesn't it always happen?

I was minding my own business the other day and suddenly the noise from the computer indicated that another post had arrived.
A tongue in cheek comment about my entries for the forthcoming 3MM Society AGM.
I have done a fair amount of modelling as those who follow this blog will know and some of it I am very proud of.
However , the rub is that all this modelling will be stuck to a piece of 16 inches by 3 foot 6inches of Swedens best 9mm ply as Teignford is due to be debuted at Wilton the previous weekend.
Apparently the committee are still out!

Friday, 4 May 2012

Engine Shed.

Before the Engine Shed can be planted, and the lack of access once it is in place, some groundwork- excuse the pun- has to be done.
here is shown the ash laid at the access to the shed. The path around to the messroom has been roughly delineated by the addition of some glue and earth colour Javis powder.Once the shed is stuck into position it will appear to rise from the earth, rather than just be sat on it!

Wednesday, 2 May 2012

Road Bridge.

 The baseboard join at the engine shed end is disguised by a hump back bridge.
If I have one weakness, it is not getting joins in scenery tight.
The abutments are meant to closely butt up against the bridge but again it is not as tight as I would wish. Still, I am pleased with the effect of the embankment shown right but needs a little more work which won't be completed before Teignfords' debut next month.
One thing I do need to do is test all the locos around the end board curve as it is tighter than the pointwork on Hennock.