Sunday 20 November 2011

Wiring continues.

 Slow progress is being made, wiring has to be right before I can proceed with ballasting.
The group has been very helpful, Nigel especially.
Seen in the top picture is the control panel, a simple diagram with switches positioned on the drawing.
The wires will eventually be harnessed into a loom with cable ties.
The lower picture shows the controls attached to the main board, the control panel folds up when transported or stored.
All for now, hopefully more in the near future.