Monday, 19 December 2011

Take a sheet of card.

 Whilst the wiring is being finished it is time to start the many buildings needed for Teignford. For this I use offcuts of Daler Mounting Card obtained as offcuts from my friendly local art shop. These come in various shapes and sizes and the ones being used are approximately A4 size with a slightly uneven finish on one side-this side is also green but no matter as it will be covered with brickpaper anyway.
The lower pic shows the start of marking out with the main dimensions marked.
Next post see's the tools used for this process.


Saturday, 17 December 2011

Prototype Inspiration

 Before commencing the construction of the buildings we need a plan-literally. However, the eventual creations will not be slavish copies but an interpretation of those buildings which existed on various locations around my chosen area.
So, a search through my modest library came up with these tomes in the top picture.
These books contain much information and more importantly-Plans! The infrastructure of many railways followed a theme - builders and architects, materials used in construction etc.
The drawings also importantly give a good idea of the size of the finished model- will it fit the available area, nothing more daunting than finishing a model to find it wont fit or the available space is too small (been ther and done it).
 The drawing on the right is from a book detailing the Helston Branch. Included with it are a set of drawings of, not only Helston, but Nancegollan and Praze. These were three sheets attached to the rear inner of the cover. The drawings were to 4mm Scale but a trip to the local printers produced a set in 3mm Scale- for my own use -Not for gain I may add.So now I have a good idea on how the sizes of the buildings will be and can move on to making them.

Sunday, 27 November 2011

Worsley Works BR Mk1 Full Brake.

West Byfleet saw another addition to the fleet of coaching stock needed for Teignford.
Another of Alans offerings, in brass, with the tumblehomes already formed. These sides together with a floof, ends, trusses and a roof are supplied. This leaves just, bogies, wheels, sideframes , roof , corridor connections and undergubbins to find. These are easily obtained from the 3mm Society or 3SMR.
The difference is that the Society bogies are sprung whilst 3SMR's offering is rigid but both do an acceptable job.
So out with the soldering iron-Again!

Sunday, 20 November 2011

Wiring continues.

 Slow progress is being made, wiring has to be right before I can proceed with ballasting.
The group has been very helpful, Nigel especially.
Seen in the top picture is the control panel, a simple diagram with switches positioned on the drawing.
The wires will eventually be harnessed into a loom with cable ties.
The lower picture shows the controls attached to the main board, the control panel folds up when transported or stored.
All for now, hopefully more in the near future.

Thursday, 27 October 2011

Wiring

I am no artist so it may come as no surprise that my wiring is functional, not pretty. The layout was, initially, a continuous circuit which, for various reasons,
disussed in an earlier entry, redesigned as a terminus to fiddleyard design.
However, the wiring has to be adapted and here is shown the resultant mess. Luckily, one of the group members is an electrician. He has kindly drawn a circuit diagram that hopefully will be implemented shortly. So, it's a matter of attaching the two main boards and getting the soldering iron out.
The connector, by the way, is a 15 way type with covering attached.

Sunday, 23 October 2011

Baseboard wiring

A good opportunity to complete the wiring of Teignford at a recent 3mm Dorset Group meeting.
Shown are a few of the ingredients of this process, plus a view of the station layout. I feel that the two sidings-top left, are too close together and compromise the site of the Goods Shed.
The point is going to be removed and a single siding substituted. This will balance the use of  the area for an end loading dock and coalyard facilities.
It is really useful to discuss ideas and in this instance has made me realise that the initial idea was too cramped.

Wednesday, 19 October 2011

Baseboard Alignment.

Alignment of baseboards is extremely important. It is a requirement that all baseboards should line up exactly whenever they are assembled.This can be done in a variety of ways. Split hinges are a popular method as are machined aligners from precision engineers. Me, I use 3mm Society  products. A simple 8mm male and female plug amde of brass inserted into the end of each board. Kept in place with a dab of UHU (other glues are available) I have complete confidence that the rails will line up every time. Inexpensive for the peace of mind they give.
These are also to be found on E-Bay under various guises, although the brass one's are, in my opinion, the favoured option.