Friday, 10 February 2012

Ballasting.

 My least favourite part of the layout building processis ballasting.
After a lot of time spent getting the layout running, then it is covered with glue and grit and afterwards still ,hopefully, works!
These are the ingredients. Ballast- in this case 'N' Gauge granite, Mist spray bottle, Eye Dropper, soft brush and glue.
The spray bottle has a couple of drops of Washing up liquid added- breaks surface tension and helps the glue flow around the ballast without it lumping.
The eye dropper is for applying the glue, the brush is to spread the ballast between the sleepers and to create a shoulder at the track edge.
The glue I use is a PVA, sold cheaply in Poundland for mmm- a Pound! This is watered down with about 50% water and a couple of drops of washing up liquid to ease the surface tension- not too much or the whole lot disappears under a sea of bubbles.

Wednesday, 8 February 2012

Control Panel.

Nigel has kindly completed the wiring and the control apnel which is now fixed securely to the side of the second board.
The sidings can be operated independantly from the Main Line making more operational interest and prevent us from falling asleep!
All that needs doing is to tidy the wires with some cable ties and thats completed.

Tuesday, 7 February 2012

Trackwork weathering.

 I was not particularly happy with the way the track colour turned out. So, as described in the last post, some more appropriate colour was purchased.
This has now been applied to the whole of the visible track and I think the result is a lot more acceptable.
The buffer stops have also been given the treatment. Once ballasted, more weathering can be applied and the lamp and buffer strip can be appropriately coloured.
Well, time to let it all dry and then ballasting can begin.

Tuesday, 31 January 2012

Painting the Rails.

Not particularly happy with the paint I had used to colour the railas, I looked for somethins a little better.
One thing about a good Model Railway Exhibition is that there is a chance to compare products.
Recently at Southampton Model Railway Societys show I looked at several products for my purpose.
The one I decided on was this.
Phoenix Precision Rusty Rails. From the sample lid colour it looks about the colour I hope to achieve.
Must crack on and try this.

Sunday, 22 January 2012

Buffer stops.

Whilst painting the rail sides, the buffers were affixed with superglue.
Given a light wash of track colour, the buffing board is yet to be coloured.
Please excuse the yellow colour, this is produced by the camera when set on fluorescent light, shoul have left it on incandescent!
However, a good base to start from and tones down the original plastic finish.

Friday, 20 January 2012

Track Colour.

 Now for the tedious bit.
The top photo shows the track as laid, cleaned with a fibreglass brush before painting to remove any dirt or flux.
Using Track Colour Acrylic paint this was applied neat to the rail sides and chairs. I reserve judgement on the use of this type of paint, always having used enamels on previous layouts.
Coverage seems not as good but will let it harden overnight before a final judgement is made.
Engine stand areas will be painted darker brown or black.
The lower photo shows the effect given when painted. A tad light but I think will be ok once ballasted.



Tuesday, 10 January 2012

Bad News.

New Year and already it brings news we would rather not hear. I have been threatened with redundancy-again and today I learnt that the hall we use may not be available to us as the caretaker is also similarly threatened.
It is in the early stages but an alternative must be lined up . So our Group members are endeavouring to find suitable venues where we can pursue our pastime.
Hopefully some good news in the not too distant future-watch this space!